← The Vancouver Wire
Infrastructure

I-205 lane closure begins Oct. 11

Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice.

Please use caution.

Effective: Oct 11, 2026, 9:19 PM

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts5 of 5 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    I-205 lane closure begins Oct. 11β€œ205 [4 mi from Vancouver]: Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice. Please use caution Effective: Oct 11, 2026, 9:19 PM 433 [35 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage.”
  • βœ“
    Right lane closed on I-205 northbound from milepost 32 to 34.8 near 63rd Street to 50th Avenue beginning Oct. 11 at 9:19 p.m.β€œ205 [4 mi from Vancouver]: Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice. Please use caution Effective: Oct 11, 2026, 9:19 PM”
  • βœ“
    Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice.β€œ205 [4 mi from Vancouver]: Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice. Please use caution Effective: Oct 11, 2026, 9:19 PM”
  • βœ“
    Please use caution.β€œPlease use caution”
  • βœ“
    Effective: Oct 11, 2026, 9:19 PMβ€œEffective: Oct 11, 2026, 9:19 PM”
Source text saved for this check (2026-10-12T06:46:35.315Z)
WSDOT highway construction and road closures within 50 miles of Vancouver β€” 10/11/2026:

205 [4 mi from Vancouver]: Construction has the right lane closed on I-205 northbound from milepost 32 near 63rd Street to milepost 34.8 near 50th Avenue beginning at 9:19 pm on October 11, 2026 until further notice. Please use caution
Effective: Oct 11, 2026, 9:19 PM

433 [35 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage.

During work some left lane closures will be needed. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays
Effective: Oct 11, 2026, 12:00 PM
Expected end: Oct 14, 2026, 5:30 AM

432 [36 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: Travelers in both directions of SR 432/Industrial will encounter nighttime single lane closures at the SR 433/Oregon Way intersection. 

During work some left lane closures will be needed. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays.
Effective: Oct 11, 2026, 12:00 PM
Expected end: Oct 14, 2026, 5:30 AM

004 [40 mi from Vancouver]: Monday, Aug. 17 through Monday, Oct. 12: Travelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work. 

Flaggers will direction travelers through the area. Plan ahead and expect delays.
Effective: Aug 17, 2026, 5:00 AM
Expected end: Oct 12, 2026, 5:00 PM

The Vancouver Wire is free. Get Vancouver's news delivered every morning.