← The Vancouver Wire
Infrastructure

I-5 off-ramp closed for maintenance

πŸ”Š Listen Β· narrated by Aiden

The off-ramp from northbound I-5 to Exit 1B for Broadway Street will be closed from 6 a.m. to 5 p.m. on Monday, Oct. 5, for maintenance work.

Travelers will need to use an alternate route.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    I-5 off-ramp closed for maintenanceβ€œ005 [1 mi from Vancouver]: Monday, Oct. 5: The off-ramp from northbound I-5 to Exit 1B for Broadway Street, will be closed from 6 a.m. to 5 p.m., for maintenance work.”
  • βœ“
    Northbound I-5 to Broadway Street off-ramp closed Oct. 5, 6 a.m. to 5 p.m. for maintenance work.β€œ005 [1 mi from Vancouver]: Monday, Oct. 5: The off-ramp from northbound I-5 to Exit 1B for Broadway Street, will be closed from 6 a.m. to 5 p.m., for maintenance work.”
  • βœ“
    The off-ramp from northbound I-5 to Exit 1B for Broadway Street will be closed from 6 a.m. to 5 p.m. on Monday, Oct. 5, for maintenance work.β€œ005 [1 mi from Vancouver]: Monday, Oct. 5: The off-ramp from northbound I-5 to Exit 1B for Broadway Street, will be closed from 6 a.m. to 5 p.m., for maintenance work.”
  • βœ“
    Travelers will need to use an alternate route.β€œTravelers will need to use an alternate route.”
Source text saved for this check (2026-10-05T12:43:46.862Z)
WSDOT highway construction and road closures within 50 miles of Vancouver β€” 10/5/2026:

005 [1 mi from Vancouver]: Monday, Oct. 5: The off-ramp from northbound I-5 to Exit 1B for Broadway Street, will be closed from 6 a.m. to 5 p.m., for maintenance work. 

Travelers will need to use an alternate route.
Effective: Oct 5, 2026, 5:00 AM
Expected end: Oct 5, 2026, 5:00 PM

004 [40 mi from Vancouver]: Monday, Aug. 17 through Friday, Oct. 9: Travelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work. 

Flaggers will direction travelers through the area. Plan ahead and expect delays.
Effective: Aug 17, 2026, 5:00 AM
Expected end: Oct 9, 2026, 5:00 PM

411 [45 mi from Vancouver]: Thursday, Oct. 1 to Friday, Oct. 16: Travelers along southbound SR 411 between Camelot Drive (milepost 10.5) and Waters Road (milepost 9.3) will shift to use a single lane weekday, from 8 a.m. to 4 p.m., for underground utility line installation work. 

Flaggers will direct travelers through the area. Plan ahead and expect delays.
Effective: Oct 1, 2026, 5:00 AM
Expected end: Oct 16, 2026, 4:00 PM

504 [46 mi from Vancouver]: Monday, Oct. 5: The right lane of eastbound SR 504 will close near South Silver Lake Road (milepost 3.5) from 8 a.m. to 3 p.m., for utility work. 

Eastbound traffic will shift to use the left lane. Travelers should slow down, stay focused and expect delays.
Effective: Oct 5, 2026, 5:00 AM
Expected end: Oct 5, 2026, 3:00 PM

The Vancouver Wire is free. Get Vancouver's news delivered every morning.