WSDOT will restrict SR 4 to a single lane between 50th Avenue and 42nd Avenue weekdays from 7:30 a.m. to 5 p.m. for buried gas line extension work. The closure will run from Aug. 17, 2026, through Oct. 12, 2026, with traffic moving in both directions through a single lane during those hours.
SR 4 lane closure for gas line work
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βSR 4 lane closure for gas line workβ004 [40 mi from Vancouver]: Monday, Aug. 17 through Monday, Oct. 12: Travelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work.β
- βWork on buried gas line extension will cause single-lane traffic on SR 4 weekdays 7:30 a.m. to 5 p.m. from Aug. 17 to Oct. 12.βMonday, Aug. 17 through Monday, Oct. 12: Travelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work.β
- βWSDOT will restrict SR 4 to a single lane between 50th Avenue and 42nd Avenue weekdays from 7:30 a.m. to 5 p.m. for buried gas line extension work. The closure will run from Aug. 17, 2026, through Oct. 12, 2026, with traffic moving in both directions through a single lane during those hours.βTravelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work.β
Source text saved for this check (2026-10-11T12:41:56.146Z)
WSDOT highway construction and road closures within 50 miles of Vancouver β 10/11/2026: 004 [40 mi from Vancouver]: Monday, Aug. 17 through Monday, Oct. 12: Travelers in both directions of SR 4 will take turns moving through a single lane between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2), weekdays from 7:30 a.m. to 5 p.m., for buried gas line extension work. Flaggers will direction travelers through the area. Plan ahead and expect delays. Effective: Aug 17, 2026, 5:00 AM Expected end: Oct 12, 2026, 5:00 PM
The Vancouver Wire is free. Get Vancouver's news delivered every morning.