Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14, the right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays.
SR 433 lane closures begin Oct. 11
π Listen Β· narrated by Aiden
π Source: WSDOT β Highway Construction & Closures β https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported Β· 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the modelβs assessment; readers can inspect the quote. Source: original document β
- βSR 433 lane closures begin Oct. 11β433 [35 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage.β
- βNightly lane closures on SR 433/Oregon Way from Oct. 11-14 for right-turn lane work, with intersection operating as four-way stop.β433 [35 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage. During work some left lane closures will be needed. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays Effective: Oct 11, 2026, 12:00 PM Expected end: Oct 14, 2026, 5:30 AMβ
- βBeginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14, the right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays.βBeginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage.β
Source text saved for this check (2026-10-13T18:47:06.933Z)
WSDOT highway construction and road closures within 50 miles of Vancouver β 10/13/2026: 500 [9 mi from Vancouver]: Construction on SR 500 both directions at milepost 9.43 near 65th Street will be alternating traffic with flaggers, use caution beginning at 8:51 am on October 13, 2026 until further notice. Effective: Oct 13, 2026, 8:51 AM 005 [10 mi from Vancouver]: Maintenance on I-5 northbound from milepost 12 near SR 502 to milepost 15 near Port Of Entry will have the left lane closed for cable barrier repair. Use caution and expect delays beginning at 10:44 am on October 13, 2026 until further notice. Effective: Oct 13, 2026, 10:44 AM 005 [22 mi from Vancouver]: Ecology on I-5 northbound from milepost 25 to milepost 27 near Todd Road will have the right shoulder closed for litter detail. Use caution when approaching the area, beginning at 7:45 am on October 13, 2026 until further notice. Effective: Oct 13, 2026, 7:45 AM 433 [35 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: The right lane on northbound SR 433/Oregon Way will close nightly at the SR 432/Industrial Way intersection for work to add a right-turn lane, striping and signage. During work some left lane closures will be needed. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays Effective: Oct 11, 2026, 12:00 PM Expected end: Oct 14, 2026, 5:30 AM 432 [36 mi from Vancouver]: Maintenance on SR 432 both directions at milepost 7.6 near Tennant Way will have the left lane closed intermittently for sweeping. Use caution beginning at 9:35 am on October 13, 2026 until further notice. Effective: Oct 13, 2026, 9:35 AM 432 [36 mi from Vancouver]: Beginning at 7 p.m. Sunday, Oct. 11, through 5:30 a.m. Wednesday, Oct. 14: Travelers in both directions of SR 432/Industrial will encounter nighttime single lane closures at the SR 433/Oregon Way intersection. During work some left lane closures will be needed. The intersection will operate as a four-way stop with a flashing red light. All drivers will come to a complete stop and take turns going through the intersection. Slow down, stay focused and expect delays. Effective: Oct 11, 2026, 12:00 PM Expected end: Oct 14, 2026, 5:30 AM 411 [40 mi from Vancouver]: Tuesday, Oct. 13: Travelers in both directions of SR 411 between Riverside Park (milepost 5.1) and Beverly Heights Road (milepost 9.5) will take turns moving through a single lane from 8 a.m. to 3:30 p.m., for utility work. Flaggers will direct travelers through the area. Slow down, stay focused and expect delays. Effective: Oct 13, 2026, 5:00 AM Expected end: Oct 13, 2026, 3:30 PM 411 [40 mi from Vancouver]: Construction on SR 411 both directions at milepost 5.1 near Louise Street will be alternating traffic with flaggers. Use caution beginning at 7:48 am on October 13, 2026 until further notice. Effective: Oct 13, 2026, 7:48 AM
The Vancouver Wire is free. Get Vancouver's news delivered every morning.