← The Vancouver Wire
Infrastructure

SR 500 Construction Begins Nov 12

πŸ”Š Listen Β· narrated by Aiden

Construction on SR 500 will begin both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road.

Traffic will be alternated through a single lane, with delays expected starting at 8:45 a.m. on November 12, 2026.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/real-time/map
Source receipts4 of 4 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    SR 500 Construction Begins Nov 12β€œ500 [Clark County, 13 mi from Vancouver]: Construction on SR 500 both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road. Traffic will be alternated through a single lane, use caution and expect delays beginning at 8:45 am on November 12, 2026 until further notice.”
  • βœ“
    Construction on SR 500 between Everett and Gardner Roads begins Nov 12, 2026, with single-lane traffic.β€œConstruction on SR 500 both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road. Traffic will be alternated through a single lane, use caution and expect delays beginning at 8:45 am on November 12, 2026 until further notice.”
  • βœ“
    Construction on SR 500 will begin both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road.β€œConstruction on SR 500 both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road.”
  • βœ“
    Traffic will be alternated through a single lane, with delays expected starting at 8:45 a.m. on November 12, 2026.β€œTraffic will be alternated through a single lane, use caution and expect delays beginning at 8:45 am on November 12, 2026 until further notice.”
Source text saved for this check (2026-11-12T19:31:01.196Z)
500 [Clark County, 13 mi from Vancouver]: Construction on SR 500 both directions from milepost 16.8 near Everett Road to milepost 16.9 near Gardner Road.  Traffic will be alternated through a single lane, use caution and expect delays beginning at 8:45 am on November 12, 2026 until further notice. 
Effective: Nov 12, 2026, 8:45 AM
Source: https://wsdot.wa.gov/travel/real-time/map

The Vancouver Wire is free. Get Vancouver's news delivered every morning.